Scope of work

Design and construction of the new link road, encompassing the planning, engineering, and execution phases to ensure a seamless connection between the existing routes.

South Sudan Link Road
  • DATE: July 2022
  • LOCATION: Kapenguria, Kenya
  • TYPE: Road construction